x
Send Your Inquiry Today
Quick Quote
Concrete Crack Repair & Sealing Solutions

Engineering Solution 4 · Structural Restoration

Concrete Crack Repair & Sealing Solutions

High-performance elastomeric polyurethane sealants and gravity-feed low-viscosity resins for structural and non-structural concrete crack repair in commercial slabs, parking decks, and industrial facilities.

SL-100
Self-Leveling PU
ASTM C920
Class 25 Movement
≥ 800%
Elongation at Break
0% Solvent
No Shrinkage




Chat on WhatsApp

Structural Concrete Restoration

Concrete Crack Repair & Structural Rehabilitation SOP

Stop moisture ingress, rebar corrosion, and crack propagation in industrial floors, parking garages, and commercial slabs with CHEMPU advanced polyurethane crack repair systems.

Crack Remediation
Active vs Dormant Crack Diagnosis
DEFECT DIAGNOSIS & CLASSIFICATION

Active vs Dormant Crack Diagnosis

Different crack mechanisms require distinct sealing approaches. Dormant shrinkage cracks can be gravity filled, while dynamic moving cracks require routed reservoir caulking with elastomeric PU.

  • Moving cracks (> 10% thermal movement): V-routed 1:1 reservoir with backer rod
  • Static hairline cracks (< 2 mm): Deep penetration gravity feed with SL-100
  • Prevents rebar oxidation and structural spalling from deicing salts



WhatsApp Us

DEEP PENETRATION REPAIR

Low-Viscosity Gravity Penetration

Self-leveling low-viscosity polyurethane flows under gravity into fine concrete fissures, displacing air voids and establishing micro-mechanical interlock with unprimed concrete walls.

  • Deep 30–50 mm gravity penetration without expensive injection port machinery
  • Self-smoothing mirror finish eliminates grinding and tooling labor
  • High elongation (≥ 800%) absorbs future ground settling without adhesive tearing



WhatsApp Us

Deep Gravity Flow
Low-Viscosity Gravity Penetration

Standard SOP
Standardized Routing & Caulking SOP
ROUTING & CAULKING METHOD

Standardized Routing & Caulking SOP

Ensures durable repair: 1. V-groove diamond routing (10×10 mm) → 2. Dust extraction → 3. Polyethylene bond breaker tape → 4. SL-100 injection → 5. 24-hr traffic return.

  • Consistent reservoir geometry guarantees calculated movement tolerance
  • Zero primer needed: direct adhesion to dry or slightly damp cured concrete
  • Resistant to motor oils, hydraulic fluids, and battery acid splashes



WhatsApp Us

FORKLIFT & TRAFFIC DURABILITY

Heavy Wheel Traffic Durability

Repaired joints and cracks withstand constant solid polyurethane forklift wheels, heavy pallet jacks, and heavy vehicle traffic in 24/7 high-bay logistics warehouses.

  • Shore A 38–42 balanced hardness prevents wheel point deflection while protecting edges
  • Zero concave sagging ensures smooth forklift transition without driver jolt
  • USDA / FDA compliant for food distribution and pharmaceutical storage facilities



WhatsApp Us

Finished Floor
Heavy Wheel Traffic Durability

Planning a Commercial Floor or Warehouse Crack Repair Project?

Submit your floor area and crack linear meter requirements for an instant chemical quantity calculation and factory direct quote.

Request Engineering Solution RFQ

Quick Quote

Scroll to Top
WeChat
WeChat:
cherry_gaoqin
WeChat QR
WhatsApp